Tuesday, March 26, 2013

Less Than 3 Weeks Left!

Today you all need to be working hard on your projects. All of these projects (clamation, mural design, and personal) need to be completed by the end of this six weeks. We also will NOT be having school this Friday and Thursday will be "Intervention Schedule". APRIL 12th is the last day of the six weeks so make a plan to finish on time!! The completion of your project is a TEST grade.

Today Art 1 will be learning how to shoot their claymation projects. You will wrap up your work on sets and props by Thursday. I would like for you to try to shoot at least 50 shots as well and practice editing it in iMovie over the weekend.

1. Use "Photo Booth" to shoot each picture. Comand "F" will flip each photo if you need to flip them for words or appearance.

2. After each time you shoot a picture, make a very small movement with your character. It may take 10-20 shots just to move an arm or take a few steps. The slower you change positions and the more you take shots the better the movie will look.

3. Once you finish photographing a scene you can highlight the pictures and click on the iPhoto icon in the corner of your Photo Booth and it will send all of them to iPhoto. Once in iPhoto you may edit the photos if you would like but make sure what ever you do to one, you do to them all! Otherwise the shot manipulated will stand out more in the actual movie.

4. Make sure you are watching the time and get to a stopping point before the bell each day.

5. I WILL BE PUTTING UP SOME STEPS ON HOW TO PUT PHOTOS IN iMOVIE!!!

Today Advanced Art Students will be finishing up preperations for their mural designs. These designs will be presented to a committee of community members that will choose their favorite. This design will win $100! Yesterday, due to many students' mental blockage, we changed the requirements of the design. The committee would like the design to be produce based in order for their to be a farmers market area at the location site. I personally feel that the mural should reflect Ralls' History. I would like you to come up with your own writen proposal and small scale painting to present to the committee. This assignment is also due in less than 3 weeks. Yes, this is a short period of time for a big assignment, but get over it, because college will be worse and so will the work force!! :) Here are your due dates:

Tuesday 26th: Short written proposal statement is due. This needs to be at least 3-5 sentences about what your mural will reflect.

Wednesday 27th: A "Rough Sketch" of your mural design is due. This is a quick preperation of the layout and composition of your mural design.

Thursday 28th: Work Day! I am going to try to set up a time for us to go to the Ralls Historical Museum for inspiration. This will possibly be during intervention time so have your work finished!

Wednesday 3rd: A "Final Drawing" of your mural design is due. This needs to be more of a detailed reference of your mural plans. I should be able to see your complete vision. You will also recieve your canvas for your painting today. You must gesso and prepare your canvas for use.

Thursday 4th: I will be gone will Alexes for State VASE... However, you will begin your under drawing for your paintings today. Once you are finished with the drawing you will spray fix your pencil.

More TBA!!!



Tuesday, March 5, 2013

Friday, March 1, 2013

5th 6-Weeks Assignments

Upper Level Art Students and Seniors
5th 6-Weeks Project Assignments:

1. Complete any unfinished assignments from last six weeks! 
On Friday 3/1, if these assignments are not completed, you will have the weekend to complete them with 10 points deducted from your grade. On Monday if these projects are not completed you will loose another 10 points and have zero hall assigned. On Tuesday if these projects are not completed you will loose another 10 points and have zero hall assigned. I will not take any projects after Wednesday. I have met with each of you to set personal daily goals.

2. Personal Expression Piece
This project may be any area of focus of your choosing. You may choose paint, clay, drawing, printmaking etc. This piece is intended for you to help build your portfolio and try a material that you have never worked with, or to continue to develop skills and techniques in a medium that you enjoy. The project due date will be the end of the six weeks with NO exceptions or extensions. I will make a list of project check point grades and expectations below. Should you choose to NOT come up with an assignment on your own, then you will have a specific project and guidelines given to you talored to your strengths.

3. Mural Contest Project 
This project is mandatory to only Art 3, 4, and VASE students! You will be taught/review perspective drawing during of the week of 3/4. You will first create several sketches within the week of 3/18. Once you decide on a sketch you will begin an 18x14 painting using acrylics or water mixable oils on a canvas board. These are due the week of 4/8 and will be a major test grade for the six weeks. You have been asked by city memebers to create a mural proposal for a project down town. They will choose the best design and award that student or community member $100.00. They will later have it painted on an outdoor wall by an artist on Main Street across from the EDGE. The site is where the painted tires are located. The criteria for the mural is that it must keep with a "Produce Theme". They would like for it to have and outdoor / indoor market feel. They would like fresh produce (fruits & vegetables) stands to be present. The site may become a place where there is an outdoor vendor for produce and they want this as a back drop.

4. Community Service Projects
There are several opportunities around town for mural assistance. We have an in progress work at the Ralls Library downtown that I would like to havecompleted by the end of spring break. We will begin an outdoor mural at the Girl Scout Hut after Spring Break. They have provided the design to be painted on the outside of their building. I would like to have this project completed by the end of April. We also have several wood panels to paint mini murals on for the Ralls Elementary Library. (Theme Dr, Suess) I would like to have these completed before the summer break. All of these projects will be bonus grades and points for each of you. Email me at ahough@esc17.net if you are interested. I will have a time schedule and signup sheet on a board in my room for each project. It is the year of the murals!!!

Due Dates, Check Grades, & Other Grades:

2/27 - Work Day Grade / Brainstorm, Sketches, Materials Collected / or Last 6-weeks Project Progress

3/1 - Last 6-Weeks Projects Due! / Personal Project Progress

3/5 - Perspective Practice Drawings / Classroom Participation Grade

3/8 - Mural Sketch Progress / Mural Artist Research / Art History

*** USE SPRING BREAK!!!!!!!!

3/18 - Mural Sketch and Proposal Due!!

The remaining dates, deadlines, and grades to be announced! (will publish here soon)


5th 6-Weeks Projects for ART 1 & 2

It is that time again, a new six weeks!! Projects are already getting underway!

The project, for all Art 1 and 2 students, is "Claymation"!


"claymation |klāˈmāSHən|(also Claymation )

noun
a method of animation in which clay figures are filmed using stop-motion photography.ORIGIN 1980s: from clay + animation."http://en.wikipedia.org/w/index.php?title=Claymationhttp://www.wallaceandgromit.com/Claymation Class Assignments & Project Due Dates:2/26 - Watch the "Wallace and Gromit, A Matter Loaf and Death" movie.2/27 - Divide into groups and brainstorm for your claymation project. Watch past student projects.2/28 - "Brainstorm" Grade! & Assign Character Drawings and Outline Assignment3/5 - "Character Drawings" and your "Outline" is due. (Include a title for your project in the outline.)3/7 - "Scene Sketches" are due3/18 - "Skript" is due*** Once you finish all three assignments, Outline, Character Drawings, Scenes & Script you will receive your polymere clay and begin sculpting your characters, building your props, and making your sets.3/20 - "Sculpting" Grade3/22 - "Characters" Grade3/25 - "Sets and Props" Grade*** Once your first scene is ready you may begin shooting your still shots. Remember to move your characters very tiny amounts for each shot. When we loop them together we do not want any major jumps. You want the shots to flow naturally. You will take your photos with your laptop using "photobooth"!3/27 - "50+ Photos" Check Grade*** Once you get a full scene shot import it into iMovie. (Directions will be in a later post!) You will create a new project and give it a title page as well as ending credits. You will need to take all of your photos off of "Ken Burns" and you will need to set all slide times to .04 seconds. (Directions will be in a later post!)3/29 - "Project Progress" Check Point Grade 4/2 - "100+ Photos" Check Grade4/4 - "200+ Photos" Check Grade4/8 - "iMovie Progress" Check Grade4/9 - Add "Voices"& "Sound Effects" (each will be a separate grade on the 12th)4/12 - "Completion Grade" & "Craftsmanship Grade"!Best Wishes!!! Comment to ask any questions while you are not in class!!!